HRG was instrumental in partnering with the Township Board of Supervisors to successfully deliver on a promise to their constituents to solve stormwater issues that previously plagued the community. A full 50 of the land will be reserved for open space and public use, such as the integration and expansion of the Derry Township Trail System. In order to alleviate the high costs associated with this necessary project, HRG successfully guided, applied for, and secured a $1.8 million Pennsylvania Infrastructure Bank Loan and a $4.3 million H2O Grant through the Commonwealth Financing Agency for Derry Township. What WE have planned: With 245 acres, the community will be built in multiple phases over the course of 10 to 15 years, in order to respond to the needs of the greater Hershey community over time. Total project cost is estimated at over $6 million and the scope of work included drainage design, stream restoration, obtaining two Water Obstruction & Encroachment permits, three NPDES permits, and five Highway Occupancy Permits (HOP). HRG’s professionals performed surveying, preliminary and final design, hydrology and hydraulic analysis, natural stream design, preliminary and final technical specifications, preparation of easement plats and documents, easement acquisitions, estimation of construction costs, permitting, utility coordination, Norfolk Southern coordination, preparation of a project manual and bidding documents, contract award services, contract administration services, and construction observation services. Addressing stormwater issues was named the #1 priority by the Township Board of Supervisors and HRG was able to address this urgent issue with a stormwater improvement project designed to reduce the frequency of flooding for the Township and their residents. THE EXPRESS PURPOSE OF SUPPORTING AND IMPROVING VARIOUS FACILITIES AND PROGRAMS ADMINISTERED BY THE DERRY TOWNSHIP DEPARTMENT OF PARKS & RECREATION. (HRG) is assisting Derry Township in the design and implementation of solutions to overcome significant and reoccurring stormwater challenges in their community. The facility also includes a senior center, teen center, full-sized gymnasium, fitness center, and several multipurpose meeting/program rooms.Herbert, Rowland & Grubic, Inc. community center complete with an indoor 25-yard competition pool, an indoor leisure pool, an outdoor leisure pool, and an outdoor sprayground. The final approved facility option was designed and subsequently opened in June 2022. In addition, a financial analysis of competitive swimming events was conducted, which included projected revenue and usage.Ĭounsilman-Hunsaker further developed financial pro forma for five separate pool options, including indoor and outdoor recreational water, to build full projections for facility operations. Counsilman-Hunsaker's process included a needs analysis that evaluated the number, types, and sizes of competitive events, including participation levels, market rates, and other economic considerations. Counsilman-Hunsaker provided the findings to allow the Township to make a well-informed decision about the number of competitive events a future aquatic center could host. Find the best campgrounds & rv parks near Derry, Pennsylvania. The study's goal was to review the regional and statewide competitive swimming market and provide commentary, knowledge, and insight to the Township. In 2019, Derry Township retained Counsilman-Hunsaker to complete an aquatic study to determine the future of aquatics for the local community.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |